Potential Projects
  1. Finishing the projects under execution.
     

  2. Watering all the villages unwatered during both years 2004 and 2005 within the available possibilities and availability of the water resource.
     

  3. District of Rabiaa and Al-Bater Province: Study is conducted by the General Commission For Remote Sensing and there are several possibilities for find out a resource.
     

  4. Finding out substitute resources for Balloran Dam to water the villages of the two districts Kastal Maaf and Kassab, wells of good water data were dug out and we are about to dig new wells for the execution of this project.
     

  5. Support the villages of Al-Mezerraa District and the watering of the service less villages – through the study of wells digging near the village of Al-Jenhanieh and
     

  6. Digging will commence soon.
     

  7. Various High mountainous villages : Wells are dug out according to the studies of the remote sensing to water these villages.
     

  8. Follow-up the substitution projects and qualifying the networks and stations previously erected and the construction of reserve tanks included in the plan.
     

  9. Substituting the Second Draw Line executed in 1980 with asbestos pipes and which become unused in potable water , where the World Health Organization has recommended not to use them . This subject has been put forward and hope to put it in the next Fifth Plan with the possibility of executing a poster station over some standing lines currently to increase the water income for the governorate.
     

  10. Executing the Health Sewage Projects which become in the circle of the establishment interest and specially the study of treatment process for the important population gatherings taking into consideration the protection of the resources and water surfaces.
     

  11. Finding out a reserve resource for the city of Latakia and that through the study of digging wells in the bed of the Al-Kebir Al-Shimali River in the region of Al-Damat according to the remote sensing study, where the project will support in addition to the city of Latakia, the standing projects – Al-Sefsaf, and an experimental welll has been dug out and the rest of the wells will be followed due to the importance of this utility .
     

  12. In the framework of modernizing and development of informatics, the Establishment has commenced to digitalize the constructional aspects specific for it; the Establishment Buildings, water resources, pumping station, filtering stations, major and minor lines of the network and homes … to be connected with the constructional aspects in the governorate and that according to organizational estate, topographical plans available by the application of the GIS

 

 

 